Solar Loan & Financing in Tamil Nadu

    Go solar with zero upfront cash. Residential loans start from 7% under the PM Surya Ghar concessional scheme (SBI standard rate from 8.15%). Commercial and industrial customers can access MSME loans, SIDBI green finance, and zero-capex OPEX models.

    Tristar assists customers across Coimbatore, Tirupur, Salem, Erode, Ooty, Dindigul and all Tamil Nadu districts — from bank quotation to subsidy disbursement.

    Why Finance Your Solar System?

    Concessional Residential Loans

    PM Surya Ghar applicants access concessional loans from ~7% via nationalized banks. SBI Surya Shakti offers the best standard rate at 8.15% with no collateral up to ₹7.5 lakh.

    EMI < Electricity Savings

    For most 3–5 kW systems, revised EMI after subsidy prepayment is ₹1,480–₹3,325/month — typically less than your monthly TANGEDCO bill reduction.

    40% Depreciation (Commercial & Industrial)

    Under the old IT regime, businesses can write off 40% of solar system cost in Year 1 under the Income Tax Act. Consult your CA to confirm applicability under your chosen tax regime.

    Tristar Handles Documentation

    We provide bank-ready quotations and assist with the full loan process — from document checklist to subsidy disbursement across all Tamil Nadu branches.

    Financing Options by Customer Type

    Rates, loan products and key benefits differ significantly for homes, businesses and factories.

    PM Surya Ghar subsidy₹30,000–₹78,000
    Concessional loan rateFrom 5%
    Typical system size1–10 kW
    Payback period3–5 years
    Collateral requiredNone up to ₹7.5 lakh
    TANGEDCO net meteringEligible
    Loan SchemeInterest RateMax TenureMax LoanCollateralNotes
    PM Surya Ghar Linked LoanBest Rate7%–9% (concessional)7–10 years₹10,00,000NilConcessional rate via nationalized banks for PM Surya Ghar applicants; actual rate set by your bank
    SBI Surya Shakti8.15%–9.50%7 years₹10,00,000Nil up to ₹7.5 lakhLowest standard rate; best for existing SBI customers
    Bank of Baroda Solar Loan8.50%–10.00%7 years₹10,00,000Nil up to ₹5 lakhAlso covers solar water heaters
    Canara Bank Solar Loan8.65%–10.25%5 years₹10,00,000Nil up to ₹5 lakhPreferred for existing Canara account holders
    HDFC Personal Loan (Solar)9.50%–12.00%5 years₹15,00,000UnsecuredFast digital approval for HDFC customers; use personal loan category for solar

    Rates as of 2026. PM Surya Ghar concessional rate subject to eligibility and bank approval. Standard rates vary with CIBIL score and MCLR.

    Residential EMI vs Electricity Savings

    SBI rate 8.50%, 5-year tenure. PM Surya Ghar subsidy applied as prepayment after commissioning.

    3 kW System
    System cost₹1,50,000
    Initial EMI₹3,075/month
    PM Surya Ghar subsidy−₹78,000
    Revised EMI₹1,480/month
    Monthly EB savings₹1,500–₹2,300/month
    Net monthly₹0 to −₹820

    savings exceed EMI

    5 kW System
    System cost₹2,40,000
    Initial EMI₹4,920/month
    PM Surya Ghar subsidy−₹78,000
    Revised EMI₹3,325/month
    Monthly EB savings₹2,500–₹4,000/month
    Net monthly₹0 to −₹675

    savings equal or exceed EMI

    10 kW System
    System cost₹4,50,000
    Initial EMI₹9,225/month
    PM Surya Ghar subsidy−₹78,000 (cap)
    Revised EMI₹7,625/month
    Monthly EB savings₹5,000–₹9,000/month
    Net monthly₹0 to ₹2,625

    net positive from month 1

    How Zero-Cash Solar Works — Step by Step

    1
    Apply for PM Surya Ghar
    Register at pmsuryaghar.gov.in and get feasibility approval.
    2
    Solar loan from your bank
    Apply at SBI, Canara, or any preferred bank with our quotation.
    3
    System installed
    Tristar completes installation in 1–2 days across Tamil Nadu.
    4
    EMI begins
    Electricity savings offset the EMI from the very first month.
    5
    Subsidy credited (Day 90–120)
    ₹30,000–₹78,000 DBT to your Aadhaar-linked account.
    6
    Prepay loan
    Use subsidy to reduce principal — EMI drops or tenure shortens.

    Solar Financing Across Tamil Nadu

    Tristar assists homeowners, businesses and factories with solar loan documentation and bank coordination in every major district. Our installations qualify with all major nationalized banks.

    CoimbatoreTirupurErodeSalemOotyDindigulKarurNamakkalDharmapuriTrichyMaduraiChennaiPollachiMettupalayam

    Subsidy Timeline: What to Expect

    Installation takes 1–2 days. TANGEDCO net metering inspection follows in 45–90 days. After uploading the commissioning certificate to the PM Surya Ghar portal, the subsidy is credited in 90–120 days. Use it immediately to prepay the loan — banks cannot block this since it is a direct DBT to your account.

    Frequently Asked Questions

    Ready to Go Solar with Zero Upfront Cost?

    Tristar provides bank-accepted quotations, coordinates with TANGEDCO for net metering, and guides you through the PM Surya Ghar subsidy process — end to end.

    Contact Us Today

    We use cookies to analyse site traffic and improve your experience. Learn more